Best Quality and Advanced Technology for our Customers

GMP Construction

Thank you for visiting the homepage of Techwin Co.,Ltd
  • assignment_turned_in Pharmaceutical/food plan (GMP construction) Engineering/construction he most experienced company in domestic life science GMP
  • assignment_turned_in Reasonable & economic GMP plant design and construction provided by Techwin
  • assignment_turned_in Perfect GMP design & construction, validation, maintenance cGMP(FDA), EUGMP, KGMP, WHOGMP
  • assignment_turned_in We build economic and reasonable plant to accomplish perfect production system by complying with GMP regulation and carrying out timely validation based on experiences on FDA and EUGMP plant construction(Design/Construction/Validation/Maintenance)
  • GMPGood Manufacturing Practice

    • Manipulation
    • Process
    • Facility system
    • Raw material

    arrow_downward

    Verification of function and condition, systemic inspection review & documentation

    subdirectory_arrow_right subdirectory_arrow_right
  • subdirectory_arrow_right
    Efficacy
  • Safety
  • subdirectory_arrow_left
    Stability

GMP 6 System

Quality System (QA)

  • Packing & Labeling System
  • Materials System
  • Production System
  • Laboratory Control System
  • Facilities & Equipment System

Major tasks of Techwin

  • Civil & Architecture (Building Construction, Clean room)
  • Mechanical (Process, Utility)
  • Piping Syste (Process, Utility) - Seniary Piping, CIP, SIP
  • HAVC System - Control System, AHU, DUCT, Clean device
  • Purfied System - PW, WFI, Clean Steam
  • Instrument
  • Electiric
  • Process Control System
  • Waste Water Treatment System (Kipp System, biological processing)

  • VMP (Validation Master Plan)
  • IQ (Installation Qualification)
  • OQ(Operation Qualification)
  • PQ(Performance Qualification)
  • Maintenance System
  • Calibration System
  • Utility Operation
  • SOPs(Standard Operation Procedures)

Service List(service item)

Service List

  • Service 01

    GMP plant design with new construction and remodeling concept Investment cost computed

  • Service 02

    GMP PLANT CONSTRUCTION

  • Service 03

    Basic & detailed design including process machineries and facilities
    (Basic and Detail Design)

  • Service 04

    Assessment of eligibility and validation (DQ/IQ/OQ/PQ)
    VMP prepared, CV, PV, CSV performed
    GMP education and document management SOPs

  • Service 05

    Purchase and procurement duties for production process machineries
    (URS, FAT, SAT, Procurement)

  • Service 06

    Defect treatment and maintenance

Service Prcedure

  • STEP 1

    DESIGN

    Concept Design
    Basic Design
    Detail Design

  • STEP 2

    CPMSTRICTOPN

    Bulding / Construction
    HWAC /Clean Room Ststem
    Water System
    Piping System (Process, Utility) Electric, Instrument, Auto-Control
    Waste Water System

  • STEP 3

    VALIDATION

    VMP (Validation Master Plan)
    IQ (Installation Qualification)
    OQ(Operation Qualification)
    PQ(Performance Qualification)
    CV(Cleaning Validation
    SMF(Site Master File)

  • STEP 4

    MAINTENANCE

    PM (Preventive Maintenance)
    Hepa Filter Management
    Calibration
    Drawing Management
    Utility Operation

Techwin Strong Point

TECHWIN Strong Point

  • Conceptual / Basic / Detail Design Ability
    • CIP System Ability
    • Center Control System Ability
  • Construction Ability
    • Sip System Ability
    • Water System Ability
  • Validation Ability
    • HAVC System Ability
    • Process Piping Ability

GMP Plant Process - including validationt

Validation Point
    • GMP Level1 & Safety Review
    Conceptual Design Study
    Preparation of Concept Study Package
    • 1. Facility
    • 2. Equipment
    • 3. Process
    • 4. Safety & Energy
    • 5. Interaction
    • Preliminary GMP Level Review
    • Hazop Study
    • Preparation of DQ, IQ, OQ, PQ Protocal
    Basic/Detail Design
    Preparation of Basic & Detail DesignPackage
    • 1. Facility
    • 2. Equipment
    • 3. Process
    • 4. Civil & Architectural
    • 5. Mechanical (Piping)
    • 6. HAVC System
    • 7. Water System
    • 8. Instrument & Electric
    • 9. Control System
    • IQ Protocol Approval
    • OQ Protocol Approval
    • PQ Protocol Approval
    Construction
    Construction Execution
    • 1. Facility
    • 2. Equipment
    • 3. Process
    • 4. Civil & Architectural
    • 5. Mechanical (Piping)
    • 6. HAVC System
    • 7. Water System
    • 8. Instrument & Electric
    • 9. Control System
    • IQ Execution Approval
    • OQ Execution Approval
    • PQ Execution Approval
    IQ, OQ, PQ
    Preparation of As Built Package
    • IQ Execution & Result Report
    • OQ Execution & Result Report
    • PQ Execution & Result Report
    • Process Validation Approval
    • Stability Test Approval
    • Cleaning Validation Approval
    Pre Production
    • Process Validation Protocol & Result Report
    • Stability Test Protocol & Result Report
    • Cleaning Validation Protocol & Result Report
Action Point