Best Quality and Advanced Technology for our Customers
NO. | Project name | Project owner | year of implementation | 기타 |
---|---|---|---|---|
153 | LGCNJ electrode #3, #4 SRP recovery facility production installation and purification installation | LG Chem(nanjing) I&E Materials Co.,Ltd. | 2017 | |
152 | Nanjing LGCNJ electrode #3, #4 raw material supply device installation work | LG Electronics Co., Ltd. | 2017 | |
151 | LG Chemical) positive electrode material 9~12 line expansion project technical service | LG Electronics Co., Ltd. | 2017 | |
150 | Poland LG CWA battery expansion construction technical service | LG Chem Industrial Materials,Inc | 2017 | |
149 | Nanjing LGCNJ 5-1 building negative pole cotter #1, #2 slurry double layer production installation work | LG Chem(nanjing) I&E Materials Co.,Ltd. | 2017 | |
148 | LGC CNJ raw material supply device renovation (LG CNJ 5-1 building CNT linear dispersion measurement line composition) | LG Electronics Co., Ltd. | 2017 | |
147 | 1.0ton/day pressurized coal entrained-bed gasifier device design/production and installation | Korea Institute of Energy Research | 2017 | |
146 | Nanjing electrode #2 CNT linear dispersion measurement line installation work | LG Chem(nanjing) I&E Materials Co.,Ltd. | 2016 | |
145 | Nanjing LGCNA electrode #1 raw material room design production installation work | LG Electronics Co., Ltd. | 2016 | |
144 | CNA electrode #1 SRP recovery facility and purifying facility installation work | LG Chem(nanjing) | 2016 | |
143 | Ochang automobile building no.1 both pole mixer LTO, NBR, CNT linear dispersion liquid inlet line additional establishment work | LG Chemical Co., Ltd. | 2016 | |
142 | Disassembly/installation work for Cheongju electrode coating die renovation | LG Chemical Co., Ltd. | 2016 | |
141 | Nanjing SRP purifying system establishment work | LG Chem(nanjing) I&E Materials Co.,Ltd. | 2016 | |
140 | Nanjing electrode raw material department both pole active material measurement line addition work | LG Chem(nanjing) I&E Materials Co.,Ltd. | 2016 | |
139 | Ochang electrode building no.1 & 2 mixer CNT linear dispersion liquid measurement system establishment work | LG Chemical Co., Ltd. | 2016 | |
138 | Nanjing electrode #2 SRP recovery facility production installation | LG Chem(nanjing) I&E Materials Co.,Ltd. | 2015 | |
137 | Nanjing Electrode 2# Raw Meterial M/C | LG Chem(nanjing) I&E Materials Co.,Ltd. | 2015 | |
136 | Lintec Korea)solvent heating system installation work | Lintec Korea Co., Ltd. | 2015 | |
135 | Premixer installation work for Ochang battery building no.1 linear dispersion liquid | LG Chemical Co., Ltd. | 2015 | |
134 | LG Chemical battery building no.1) conductor #1 facility improvement work | LG Chemical Co., Ltd. | 2015 | |
133 | Nanjing electrode #1 raw material room ancillary facility work | LG Chem(nanjing) I&E Materials Co.,Ltd. | 2015 | |
132 | Nanjing electrode #1 SRP recovery facility production installation | LG Chem(nanjing) I&E Materials Co.,Ltd. | 2015 | |
131 | Nanjing Electrode 1# Raw Material M/C | LG Chem(nanjing) I&E Materials Co.,Ltd. | 2015 | |
130 | Additional improvement work on composition of Mobile battery building no.1 conductor linear dispersion internalization | LG Chemical Co., Ltd. | 2015 | |
129 | Ochang electrode linear dispersion internalization line establishment work | LG Chemical Co., Ltd. | 2015 | |
128 | VOCs energization system production and installation | SiHeung Green Environment Center | 2014 | |
127 | VOC Desorption bed System | Korea Institute of Energy Research | 2014 | |
126 | 1 BPD synthetic oil production system production facility production installation | Korea Institute of Energy Research | 2014 | |
125 | Process facility and control system establishment | LG Chemical Co. Ltd./Cheongju | 2012 | |
124 | PILOT INTEGRATED DRYER SYTEM | SK Innovation Co. Ltd. | 2012 | |
123 | Battery electrode #4 SRP CAPA UP work | LG Chemical Co. Ltd./Ochang | 2012 | |
122 | Mid to large type building no.2 slurry transportation instrumentation work | LG Chemical Co. Ltd./Ochang | 2012 | |
121 | Ochang plant no.2 SRS raw material room change of production installation specification work | LG Chemical Co. Ltd./Ochang | 2011 | |
120 | LGCMI. SRS kota expansion raw material room work | LG Chem Michigan | 2011 | |
119 | battery building electrode slurry instrumentation work | Ilkwang Tech Co. Ltd. | 2011 | |
118 | battery building mixer room polarization work | LG Chemical Co. Ltd./Ochang | 2011 | |
117 | production & installation of low quality coal solid-liquid separation process and oil absorption process | Korea Institute of Energy Research | 2011 | |
116 | Mid to large type electrode raw material room work | LG Chemical Co. Ltd./Ochang | 2011 | |
115 | Ochang 2nd plant battery mid to large type SRS 2 building construction technical service | LG Chemical Co. Ltd./Ochang | 2011 | |
114 | North American electrode SRP production installation work | LG Chem Michigan | 2011 | |
113 | Mid to large type electrode SRP recovery facility production installation/td> | LG Chemical Co. Ltd./Ochang | 2011 | |
112 | North American electrode raw material room work | LG Chem Michigan | 2011 | |
111 | Ochang 2nd plant SRS raw material room installation work | LG Chemical Co. Ltd./Ochang | 2011 | |
110 | LG Chemical Ochang battery mid to large type electrode expansion technical service | LG Chemical Co. Ltd./Ochang | 2011 | |
109 | B1 PROJECT production facility work | ENG Technology Co. Ltd. | 2011 | |
108 | 1T/D grade coal gasification process design production and installation | Korea Institute of Energy Research | 2011 | |
107 | OLED substance plumbing and common device system establishment | LG Chemical Co. Ltd./Ochang | 2011 | |
106 | Electrode #7 SRP recovery facility production installation and installation work | LG Chemical Co. Ltd./Ochang | 2011 | |
105 | Facility, production, installation and commissioning of medication system for producing synthetic oil using 15 BPD coal | Korea Institute of Energy Research | 2011 | |
104 | Mid to large type electrode slurry transportation electric instrumentation work | LG Chemical Co. Ltd./Ochang | 2011 | |
103 | Electronic material S-TFT related technical service | LG Chemical Co. Ltd./Ochang | 2011 | |
102 | Electrode mixer room production and installation work | LG Chemical Co. Ltd./Ochang | 2011 | |
101 | Mid to large type electrode cotter external ventilation duct work | LG Chemical Co. Ltd./Ochang | 2011 | |
100 | OLED substance plant construction project technical service | LG Chemical Co. Ltd./Cheongju | 2011 | |
99 | Cathode active precursor pilot facility production installation | ENF Technology Co. Ltd. | 2011 | |
98 | battery mid to large type electrode technical service | LG Chemical Co. Ltd./Ochang | 2010 | |
97 | LED ENCAP plumbing and electric machinery device installation work | LG Chemical Co. Ltd./Cheongju | 2010 | |
96 | Mid to large type electrode slurry transportation tank electric instrumentation work | LG Chemical Co. Ltd./Ochang | 2010 | |
95 | Mid to large type external ventilation duct work | LG Chemical Co. Ltd./Ochang | 2010 | |
94 | Mid to large type SRS raw material room work사 | LG Chemical Co. Ltd./Ochang | 2010 | |
93 | Mid to large type raw material room work | LG Chemical Co. Ltd./Ochang | 2010 | |
92 | Positive electrode material expansion technical service | LG Chemical Co. Ltd./Cheongju | 2010 | |
91 | Positive electrode material process device and plumbing system establishment work | LG Chemical Co. Ltd./Cheongju | 2010 | |
90 | Mid to large type electrode raw material room work | LG Chemical Co. Ltd./Ochang | 2010 | |
89 | Low grade coal pilot size drying stabilization integrated process production | Korea Institute of Energy Research | 2010 | |
88 | Manufacturing & installation of synthetic oil production system using 15 BPD coal | Korea Institute of Energy Research | 2010 | |
87 | Electrolysis liquid expansion project technical service | LG Chemical Co. Ltd./Cheongju | 2010 | |
86 | Electrolysis liquid process plumbing system establishment work | LG Chemical Co. Ltd./Cheongju | 2010 | |
85 | 2010 LG Chemical Ochang battery mid to large type technical service/td> | LG Chemical Co. Ltd./Ochang | 2010 | |
84 | Low grade coal drying system pilot design production installation | Korea Institute of Energy Research | 2011 | |
83 | project pilot system expansion work | LG Chemical Co. Ltd./Cheongju | 2009 | |
82 | Coal processing slurry system production installation | Korea Institute of Energy Research | 2009 | |
81 | Mid to large type electrode mixer room work | LG Chemical Co. Ltd./Ochang | 2009 | |
80 | Manufacturing installation of gasifier using 1T/D grade coal | Korea Institute of Energy Research | 2009 | |
79 | Positive electrode material ancillary facility and plumbing work | LG Chemical Co. Ltd./Cheongju | 2009 | |
78 | Positive electrode material expansion and system device and plumbing work | LG Chemical Co. Ltd./Cheongju | 2009 | |
77 | Positive electrode material production line facility work | LG Chemical Co. Ltd./Cheongju | 2009 | |
76 | Battery electrode project technologies service | LG Chemical Co. Ltd./Ochang | 2009 | |
75 | Ink production facility and office building expansion work | Korim Co. Ltd. | 2008 | |
74 | Battery building electrode production line facility production installation | LG Chemical Co. Ltd./Ochang | 2008 | |
73 | Battery building mixer room plumbing work | LG Chemical Co. Ltd./Ochang | 2008 | |
72 | Electrode raw material room work | LG Chemical Co. Ltd./Ochang | 2008 | |
71 | Battery building raw material room facility production installation | LG Chemical Co. Ltd./Ochang | 2008 | |
70 | SN project PW system and process plumbing work | Samnam Pharmaceutical Co. Ltd. | 2008 | |
69 | Toner expansion machinery, electric work | LG Chemical Co. Ltd./Iksan | 2008 | |
68 | Project expansion technical service | LG Chemical Co. Ltd./Ochang | 2007 | |
67 | Project technical service | Samnam Pharmaceutical | 2007 | |
66 | LGLS large scale alpha IA Project work | LG Life Science Co. Ltd/Iksan | 2007 | |
65 | Raw material processing facilities reinforcing work | KT&G Co. Ltd | 2007 | |
64 | Project technical service | Dongbang FTLCo., Ltd. | 2007 | |
63 | Waste heat recovery work | LG Chemical Co. Ltd. Daesan | 2006 | |
62 | Oven production installation work | Yusung Chemical Industry Co. Ltd. | 2006 | |
61 | BNF project work | Endicorp Co. Ltd. | 2006 | |
60 | Process improvement work | LG Chemical Co. Ltd. Daesan | 2006 | |
59 | U.S. local plant project | Mark Stone Co. Ltd. | 2006 | |
58 | Pilot facility improvement work | LG Chemical Co., Ltd. Technology Institute | 2006 | |
57 | Project technical service | LG Chemical Co., Ltd. Cheongju | 2006 | |
56 | Process sector turnkey work | LG Chemical Co., Ltd. Cheongju | 2006 | |
55 | Raw material room mixer and measurement facility production installation work | LG Chemical Co., Ltd. Ochang | 2006 | |
54 | LGCIM maintenance technical service | LGCIM | 2006 | |
53 | Monoryum 2nd plant rationalization technical service | LG Chemical Co., Ltd./ Cheongju | 2005 | |
52 | PTVS technical service | LG Chemical Co., Ltd./ Ochang | 2005 | |
51 | Main Power main line work | LG Chem Industrial Materials,Inc/U.S. | 2005 | |
50 | Optical mixing room production installation work | LG Chemical Co., Ltd./ Ochang | 2005 | |
49 | Optical raw material room production installation work | LG Chemical Co., Ltd./ Ochang | 2005 | |
48 | LGCIM) himax MEP related local work | LG Chem Industrial Materials,Inc/U.S. | 2005 | |
47 | Light walking facility rationalization project technical service | LG Chemical Co., Ltd./ Cheongju | 2005 | |
46 | VINYL SIDING ancillary facility production, installation | LG Chemical Co., Ltd./ Cheongju | 2005 | |
45 | Light walking Em view installation technical service | LG Chemical Co., Ltd./ Cheongju | 2005 | |
44 | Video material photosensitive material installation & expansion ENG | LG Chemical Co., Ltd. / Cheongju plant | 2004 | |
43 | Battery plant raw material feeding and measurement | LG Chemical Co., Ltd./ Ochang Technopark | 2004 | |
42 | Facility production. installation | LG Chemical Co. Ltd. / Ochang Technopark | 2004 | |
41 | LGCN optical ancillary facility production purchase | LG International Corp | 2004 | |
40 | Taiwan optical ancillary facility production purchase | LG International Corp | 2004 | |
39 | China new type building material VIP TILE expansion service | China Tianjin LG New Building Material | 2004 | |
38 | U.S. himax project domestic facility turn key work | LGChemIndustrialMaterials,Inc | 2004 | |
37 | INS facility relocation work | INS Co. Ltd. | 2004 | |
36 | Heat treatment facility, production assembly, commissioning | SSC Co. Ltd. | 2003 | |
35 | Raw material feeding and measurement facility production, installation | LG Chemical / Ochang Technopark | 2003 | |
34 | New expansion ENG | LG Chemical Co., Ltd. / Cheongju plant | 2003 | |
33 | Facility relocation work | INS Co., Ltd. | 2003 | |
32 | Raw material room installation work | Heesung Chemical Co. Ltd. | 2002 | |
31 | Toner expansion installation work | LG Chemical / Iksan | 2002 | |
30 | Oven production installation work | LG Chemical / Cheongju | 2002 | |
29 | EPC facilities production and installation work | LG Chemical / Iksan | 2002 | |
28 | CAL relocation work | Woojin Corporation | 2002 | |
27 | China Tianjin VIP tile work | LG Chemical | 2002 | |
26 | Production facility installation work | PNC Co. Ltd. | 2001 | |
25 | Machinery relocation and installation work | Mosel Wallpaer Co., Ltd. | 2002 | |
24 | Relocation work accompanied by compressor | LG Chemical / Iksan | 2001 | |
23 | Expansion PROJECT | Mosel Wallpaer Co., Ltd. | 2001 | |
22 | Utility plumbing work | Techwinpia Co. Ltd. | 2001 | |
21 | Dust collection and ancillary facility production installation work | Woojin Corporation | 2001 | |
20 | Electric facilities installation electric work | Techwinpia Co. Ltd. | 2001 | |
19 | Vietnamese production facility production | LG Chemical / Cheongju | 2001 | |
18 | Pre-mixer room relocation work | LG Chemical / Iksan | 2001 | |
17 | Console for press production and electric work | Samchang Heavy Industry | 2001 | |
16 | CUTTING SAW M/C production installation | LG Chemical / Cheongju | 2001 | |
15 | Press out line work | LG Chemical / Iksan | 2001 | |
14 | Pilot facility production | LG Chemical / Cheongju | 2001 | |
13 | production line facility work | Haengsung Chemical Co. Ltd. | 2001 | |
12 | Woodworking processor installation work | Daebung Corporation | 2001 | |
11 | Research Pilot building facility rearrangement | LG Chemical / Cheongju | 2001 | |
10 | Smart wall panel cutter renovation work | LG Chemical / Cheongju | 2001 | |
9 | Manufacturing facility relocation electric work | Seoul Aerosol | 2001 | |
8 | Firefighting facility electric work | LG Chemical / Iksan | 2001 | |
7 | New production of wall panel mold and additional electric work | LG Chemical / Cheongju | 2001 | |
6 | Bag Filter duct work | Daea machinery | 2001 | |
5 | Boiler pipe cleaning and device purchases | Techwinpia Co. Ltd. | 2001 | |
4 | AUTO Feeding System | Haengsung Chemical Co. Ltd. | 2001 | |
3 | Expansion H-PJT technical service | LG Chemical / Cheongju | 2001 | |
2 | PVC measurement and raw material transportation work | Heesung Chemical Co. Ltd. | 2001 | |
1 | Calender relocation work | Woojin Corporation Co. Ltd. | 2001 |