본문바로가기

Best Quality and Advanced Technology for our Customers

Plant construction

Thank you for visiting the homepage of Techwin Co.,Ltd
플랜트
Techwin provides the best solution in specialized plant areas comprised of domestic and overseas industrial, chemical, and environmental plant from feasibility study to design, procurement, construction and commissioning based on excellent specialists and core design technologies only possessed by Techwin.

Major areas

  • offline_bolt
    Electric material plant
  • toys
    Industrial plant
  • scatter_plot
    Basic chemistry plant
  • wb_iridescent
    Precision chemistry plant plant
  • ev_station
    Coal, Petroleum plant plant

Major accomplishments in plant engineering

Major accomplishments in plant engineering/caption>
NO. Project name Project owner year of implementation 기타
153 LGCNJ electrode #3, #4 SRP recovery facility production installation and purification installation LG Chem(nanjing) I&E Materials Co.,Ltd. 2017  
152 Nanjing LGCNJ electrode #3, #4 raw material supply device installation work LG Electronics Co., Ltd. 2017  
151 LG Chemical) positive electrode material 9~12 line expansion project technical service LG Electronics Co., Ltd. 2017  
150 Poland LG CWA battery expansion construction technical service LG Chem Industrial Materials,Inc 2017  
149 Nanjing LGCNJ 5-1 building negative pole cotter #1, #2 slurry double layer production installation work LG Chem(nanjing) I&E Materials Co.,Ltd. 2017  
148 LGC CNJ raw material supply device renovation (LG CNJ 5-1 building CNT linear dispersion measurement line composition) LG Electronics Co., Ltd. 2017  
147 1.0ton/day pressurized coal entrained-bed gasifier device design/production and installation Korea Institute of Energy Research 2017  
146 Nanjing electrode #2 CNT linear dispersion measurement line installation work LG Chem(nanjing) I&E Materials Co.,Ltd. 2016  
145 Nanjing LGCNA electrode #1 raw material room design production installation work LG Electronics Co., Ltd. 2016  
144 CNA electrode #1 SRP recovery facility and purifying facility installation work LG Chem(nanjing) 2016  
143 Ochang automobile building no.1 both pole mixer LTO, NBR, CNT linear dispersion liquid inlet line additional establishment work LG Chemical Co., Ltd. 2016  
142 Disassembly/installation work for Cheongju electrode coating die renovation LG Chemical Co., Ltd. 2016  
141 Nanjing SRP purifying system establishment work LG Chem(nanjing) I&E Materials Co.,Ltd. 2016  
140 Nanjing electrode raw material department both pole active material measurement line addition work LG Chem(nanjing) I&E Materials Co.,Ltd. 2016  
139 Ochang electrode building no.1 & 2 mixer CNT linear dispersion liquid measurement system establishment work LG Chemical Co., Ltd. 2016  
138 Nanjing electrode #2 SRP recovery facility production installation LG Chem(nanjing) I&E Materials Co.,Ltd. 2015  
137 Nanjing Electrode 2# Raw Meterial M/C LG Chem(nanjing) I&E Materials Co.,Ltd. 2015  
136 Lintec Korea)solvent heating system installation work Lintec Korea Co., Ltd. 2015  
135 Premixer installation work for Ochang battery building no.1 linear dispersion liquid LG Chemical Co., Ltd. 2015  
134 LG Chemical battery building no.1) conductor #1 facility improvement work LG Chemical Co., Ltd. 2015  
133 Nanjing electrode #1 raw material room ancillary facility work LG Chem(nanjing) I&E Materials Co.,Ltd. 2015  
132 Nanjing electrode #1 SRP recovery facility production installation LG Chem(nanjing) I&E Materials Co.,Ltd. 2015  
131 Nanjing Electrode 1# Raw Material M/C LG Chem(nanjing) I&E Materials Co.,Ltd. 2015  
130 Additional improvement work on composition of Mobile battery building no.1 conductor linear dispersion internalization LG Chemical Co., Ltd. 2015  
129 Ochang electrode linear dispersion internalization line establishment work LG Chemical Co., Ltd. 2015  
128 VOCs energization system production and installation SiHeung Green Environment Center 2014  
127 VOC Desorption bed System Korea Institute of Energy Research 2014  
126 1 BPD synthetic oil production system production facility production installation Korea Institute of Energy Research 2014  
125 Process facility and control system establishment LG Chemical Co. Ltd./Cheongju 2012  
124 PILOT INTEGRATED DRYER SYTEM SK Innovation Co. Ltd. 2012  
123 Battery electrode #4 SRP CAPA UP work LG Chemical Co. Ltd./Ochang 2012  
122 Mid to large type building no.2 slurry transportation instrumentation work LG Chemical Co. Ltd./Ochang 2012  
121 Ochang plant no.2 SRS raw material room change of production installation specification work LG Chemical Co. Ltd./Ochang 2011  
120 LGCMI. SRS kota expansion raw material room work LG Chem Michigan 2011  
119 battery building electrode slurry instrumentation work Ilkwang Tech Co. Ltd. 2011  
118 battery building mixer room polarization work LG Chemical Co. Ltd./Ochang 2011  
117 production & installation of low quality coal solid-liquid separation process and oil absorption process Korea Institute of Energy Research 2011  
116 Mid to large type electrode raw material room work LG Chemical Co. Ltd./Ochang 2011  
115 Ochang 2nd plant battery mid to large type SRS 2 building construction technical service LG Chemical Co. Ltd./Ochang 2011  
114 North American electrode SRP production installation work LG Chem Michigan 2011  
113 Mid to large type electrode SRP recovery facility production installation/td> LG Chemical Co. Ltd./Ochang 2011  
112 North American electrode raw material room work LG Chem Michigan 2011  
111 Ochang 2nd plant SRS raw material room installation work LG Chemical Co. Ltd./Ochang 2011  
110 LG Chemical Ochang battery mid to large type electrode expansion technical service LG Chemical Co. Ltd./Ochang 2011  
109 B1 PROJECT production facility work ENG Technology Co. Ltd. 2011  
108 1T/D grade coal gasification process design production and installation Korea Institute of Energy Research 2011  
107 OLED substance plumbing and common device system establishment LG Chemical Co. Ltd./Ochang 2011  
106 Electrode #7 SRP recovery facility production installation and installation work LG Chemical Co. Ltd./Ochang 2011  
105 Facility, production, installation and commissioning of medication system for producing synthetic oil using 15 BPD coal Korea Institute of Energy Research 2011  
104 Mid to large type electrode slurry transportation electric instrumentation work LG Chemical Co. Ltd./Ochang 2011  
103 Electronic material S-TFT related technical service LG Chemical Co. Ltd./Ochang 2011  
102 Electrode mixer room production and installation work LG Chemical Co. Ltd./Ochang 2011  
101 Mid to large type electrode cotter external ventilation duct work LG Chemical Co. Ltd./Ochang 2011  
100 OLED substance plant construction project technical service LG Chemical Co. Ltd./Cheongju 2011  
99 Cathode active precursor pilot facility production installation ENF Technology Co. Ltd. 2011  
98 battery mid to large type electrode technical service LG Chemical Co. Ltd./Ochang 2010  
97 LED ENCAP plumbing and electric machinery device installation work LG Chemical Co. Ltd./Cheongju 2010  
96 Mid to large type electrode slurry transportation tank electric instrumentation work LG Chemical Co. Ltd./Ochang 2010  
95 Mid to large type external ventilation duct work LG Chemical Co. Ltd./Ochang 2010  
94 Mid to large type SRS raw material room work사 LG Chemical Co. Ltd./Ochang 2010  
93 Mid to large type raw material room work LG Chemical Co. Ltd./Ochang 2010  
92 Positive electrode material expansion technical service LG Chemical Co. Ltd./Cheongju 2010  
91 Positive electrode material process device and plumbing system establishment work LG Chemical Co. Ltd./Cheongju 2010  
90 Mid to large type electrode raw material room work LG Chemical Co. Ltd./Ochang 2010  
89 Low grade coal pilot size drying stabilization integrated process production Korea Institute of Energy Research 2010  
88 Manufacturing & installation of synthetic oil production system using 15 BPD coal Korea Institute of Energy Research 2010  
87 Electrolysis liquid expansion project technical service LG Chemical Co. Ltd./Cheongju 2010  
86 Electrolysis liquid process plumbing system establishment work LG Chemical Co. Ltd./Cheongju 2010  
85 2010 LG Chemical Ochang battery mid to large type technical service/td> LG Chemical Co. Ltd./Ochang 2010  
84 Low grade coal drying system pilot design production installation Korea Institute of Energy Research 2011  
83 project pilot system expansion work LG Chemical Co. Ltd./Cheongju 2009  
82 Coal processing slurry system production installation Korea Institute of Energy Research 2009  
81 Mid to large type electrode mixer room work LG Chemical Co. Ltd./Ochang 2009  
80 Manufacturing installation of gasifier using 1T/D grade coal Korea Institute of Energy Research 2009  
79 Positive electrode material ancillary facility and plumbing work LG Chemical Co. Ltd./Cheongju 2009  
78 Positive electrode material expansion and system device and plumbing work LG Chemical Co. Ltd./Cheongju 2009  
77 Positive electrode material production line facility work LG Chemical Co. Ltd./Cheongju 2009  
76 Battery electrode project technologies service LG Chemical Co. Ltd./Ochang 2009  
75 Ink production facility and office building expansion work Korim Co. Ltd. 2008  
74 Battery building electrode production line facility production installation LG Chemical Co. Ltd./Ochang 2008  
73 Battery building mixer room plumbing work LG Chemical Co. Ltd./Ochang 2008  
72 Electrode raw material room work LG Chemical Co. Ltd./Ochang 2008  
71 Battery building raw material room facility production installation LG Chemical Co. Ltd./Ochang 2008  
70 SN project PW system and process plumbing work Samnam Pharmaceutical Co. Ltd. 2008  
69 Toner expansion machinery, electric work LG Chemical Co. Ltd./Iksan 2008  
68 Project expansion technical service LG Chemical Co. Ltd./Ochang 2007  
67 Project technical service Samnam Pharmaceutical 2007  
66 LGLS large scale alpha IA Project work LG Life Science Co. Ltd/Iksan 2007  
65 Raw material processing facilities reinforcing work KT&G Co. Ltd 2007  
64 Project technical service Dongbang FTLCo., Ltd. 2007  
63 Waste heat recovery work LG Chemical Co. Ltd. Daesan 2006  
62 Oven production installation work Yusung Chemical Industry Co. Ltd. 2006  
61 BNF project work Endicorp Co. Ltd. 2006  
60 Process improvement work LG Chemical Co. Ltd. Daesan 2006  
59 U.S. local plant project Mark Stone Co. Ltd. 2006  
58 Pilot facility improvement work LG Chemical Co., Ltd. Technology Institute 2006  
57 Project technical service LG Chemical Co., Ltd. Cheongju 2006  
56 Process sector turnkey work LG Chemical Co., Ltd. Cheongju 2006  
55 Raw material room mixer and measurement facility production installation work LG Chemical Co., Ltd. Ochang 2006  
54 LGCIM maintenance technical service LGCIM 2006  
53 Monoryum 2nd plant rationalization technical service LG Chemical Co., Ltd./ Cheongju 2005  
52 PTVS technical service LG Chemical Co., Ltd./ Ochang 2005  
51 Main Power main line work LG Chem Industrial Materials,Inc/U.S. 2005  
50 Optical mixing room production installation work LG Chemical Co., Ltd./ Ochang 2005  
49 Optical raw material room production installation work LG Chemical Co., Ltd./ Ochang 2005  
48 LGCIM) himax MEP related local work LG Chem Industrial Materials,Inc/U.S. 2005  
47 Light walking facility rationalization project technical service LG Chemical Co., Ltd./ Cheongju 2005  
46 VINYL SIDING ancillary facility production, installation LG Chemical Co., Ltd./ Cheongju 2005  
45 Light walking Em view installation technical service LG Chemical Co., Ltd./ Cheongju 2005  
44 Video material photosensitive material installation & expansion ENG LG Chemical Co., Ltd. / Cheongju plant 2004  
43 Battery plant raw material feeding and measurement LG Chemical Co., Ltd./ Ochang Technopark 2004  
42 Facility production. installation LG Chemical Co. Ltd. / Ochang Technopark 2004  
41 LGCN optical ancillary facility production purchase LG International Corp 2004  
40 Taiwan optical ancillary facility production purchase LG International Corp 2004  
39 China new type building material VIP TILE expansion service China Tianjin LG New Building Material 2004  
38 U.S. himax project domestic facility turn key work LGChemIndustrialMaterials,Inc 2004  
37 INS facility relocation work INS Co. Ltd. 2004  
36 Heat treatment facility, production assembly, commissioning SSC Co. Ltd. 2003  
35 Raw material feeding and measurement facility production, installation LG Chemical / Ochang Technopark 2003  
34 New expansion ENG LG Chemical Co., Ltd. / Cheongju plant 2003  
33 Facility relocation work INS Co., Ltd. 2003  
32 Raw material room installation work Heesung Chemical Co. Ltd. 2002  
31 Toner expansion installation work LG Chemical / Iksan 2002  
30 Oven production installation work LG Chemical / Cheongju 2002  
29 EPC facilities production and installation work LG Chemical / Iksan 2002  
28 CAL relocation work Woojin Corporation 2002  
27 China Tianjin VIP tile work LG Chemical 2002  
26 Production facility installation work PNC Co. Ltd. 2001  
25 Machinery relocation and installation work Mosel Wallpaer Co., Ltd. 2002  
24 Relocation work accompanied by compressor LG Chemical / Iksan 2001  
23 Expansion PROJECT Mosel Wallpaer Co., Ltd. 2001  
22 Utility plumbing work Techwinpia Co. Ltd. 2001  
21 Dust collection and ancillary facility production installation work Woojin Corporation 2001  
20 Electric facilities installation electric work Techwinpia Co. Ltd. 2001  
19 Vietnamese production facility production LG Chemical / Cheongju 2001  
18 Pre-mixer room relocation work LG Chemical / Iksan 2001  
17 Console for press production and electric work Samchang Heavy Industry 2001  
16 CUTTING SAW M/C production installation LG Chemical / Cheongju 2001  
15 Press out line work LG Chemical / Iksan 2001  
14 Pilot facility production LG Chemical / Cheongju 2001  
13 production line facility work Haengsung Chemical Co. Ltd. 2001  
12 Woodworking processor installation work Daebung Corporation 2001  
11 Research Pilot building facility rearrangement LG Chemical / Cheongju 2001  
10 Smart wall panel cutter renovation work LG Chemical / Cheongju 2001  
9 Manufacturing facility relocation electric work Seoul Aerosol 2001  
8 Firefighting facility electric work LG Chemical / Iksan 2001  
7 New production of wall panel mold and additional electric work LG Chemical / Cheongju 2001  
6 Bag Filter duct work Daea machinery 2001  
5 Boiler pipe cleaning and device purchases Techwinpia Co. Ltd. 2001  
4 AUTO Feeding System Haengsung Chemical Co. Ltd. 2001  
3 Expansion H-PJT technical service LG Chemical / Cheongju 2001  
2 PVC measurement and raw material transportation work Heesung Chemical Co. Ltd. 2001  
1 Calender relocation work Woojin Corporation Co. Ltd. 2001