| NO. | Project name | Project owner | year of implementation | 기타 |
|---|---|---|---|---|
| 153 | LGCNJ electrode #3, #4 SRP recovery facility production installation and purification installation | LG Chem(nanjing) I&E Materials Co.,Ltd. | 2017 | |
| 152 | Nanjing LGCNJ electrode #3, #4 raw material supply device installation work | LG Electronics Co., Ltd. | 2017 | |
| 151 | LG Chemical) positive electrode material 9~12 line expansion project technical service | LG Electronics Co., Ltd. | 2017 | |
| 150 | Poland LG CWA battery expansion construction technical service | LG Chem Industrial Materials,Inc | 2017 | |
| 149 | Nanjing LGCNJ 5-1 building negative pole cotter #1, #2 slurry double layer production installation work | LG Chem(nanjing) I&E Materials Co.,Ltd. | 2017 | |
| 148 | LGC CNJ raw material supply device renovation (LG CNJ 5-1 building CNT linear dispersion measurement line composition) | LG Electronics Co., Ltd. | 2017 | |
| 147 | 1.0ton/day pressurized coal entrained-bed gasifier device design/production and installation | Korea Institute of Energy Research | 2017 | |
| 146 | Nanjing electrode #2 CNT linear dispersion measurement line installation work | LG Chem(nanjing) I&E Materials Co.,Ltd. | 2016 | |
| 145 | Nanjing LGCNA electrode #1 raw material room design production installation work | LG Electronics Co., Ltd. | 2016 | |
| 144 | CNA electrode #1 SRP recovery facility and purifying facility installation work | LG Chem(nanjing) | 2016 | |
| 143 | Ochang automobile building no.1 both pole mixer LTO, NBR, CNT linear dispersion liquid inlet line additional establishment work | LG Chemical Co., Ltd. | 2016 | |
| 142 | Disassembly/installation work for Cheongju electrode coating die renovation | LG Chemical Co., Ltd. | 2016 | |
| 141 | Nanjing SRP purifying system establishment work | LG Chem(nanjing) I&E Materials Co.,Ltd. | 2016 | |
| 140 | Nanjing electrode raw material department both pole active material measurement line addition work | LG Chem(nanjing) I&E Materials Co.,Ltd. | 2016 | |
| 139 | Ochang electrode building no.1 & 2 mixer CNT linear dispersion liquid measurement system establishment work | LG Chemical Co., Ltd. | 2016 | |
| 138 | Nanjing electrode #2 SRP recovery facility production installation | LG Chem(nanjing) I&E Materials Co.,Ltd. | 2015 | |
| 137 | Nanjing Electrode 2# Raw Meterial M/C | LG Chem(nanjing) I&E Materials Co.,Ltd. | 2015 | |
| 136 | Lintec Korea)solvent heating system installation work | Lintec Korea Co., Ltd. | 2015 | |
| 135 | Premixer installation work for Ochang battery building no.1 linear dispersion liquid | LG Chemical Co., Ltd. | 2015 | |
| 134 | LG Chemical battery building no.1) conductor #1 facility improvement work | LG Chemical Co., Ltd. | 2015 | |
| 133 | Nanjing electrode #1 raw material room ancillary facility work | LG Chem(nanjing) I&E Materials Co.,Ltd. | 2015 | |
| 132 | Nanjing electrode #1 SRP recovery facility production installation | LG Chem(nanjing) I&E Materials Co.,Ltd. | 2015 | |
| 131 | Nanjing Electrode 1# Raw Material M/C | LG Chem(nanjing) I&E Materials Co.,Ltd. | 2015 | |
| 130 | Additional improvement work on composition of Mobile battery building no.1 conductor linear dispersion internalization | LG Chemical Co., Ltd. | 2015 | |
| 129 | Ochang electrode linear dispersion internalization line establishment work | LG Chemical Co., Ltd. | 2015 | |
| 128 | VOCs energization system production and installation | SiHeung Green Environment Center | 2014 | |
| 127 | VOC Desorption bed System | Korea Institute of Energy Research | 2014 | |
| 126 | 1 BPD synthetic oil production system production facility production installation | Korea Institute of Energy Research | 2014 | |
| 125 | Process facility and control system establishment | LG Chemical Co. Ltd./Cheongju | 2012 | |
| 124 | PILOT INTEGRATED DRYER SYTEM | SK Innovation Co. Ltd. | 2012 | |
| 123 | Battery electrode #4 SRP CAPA UP work | LG Chemical Co. Ltd./Ochang | 2012 | |
| 122 | Mid to large type building no.2 slurry transportation instrumentation work | LG Chemical Co. Ltd./Ochang | 2012 | |
| 121 | Ochang plant no.2 SRS raw material room change of production installation specification work | LG Chemical Co. Ltd./Ochang | 2011 | |
| 120 | LGCMI. SRS kota expansion raw material room work | LG Chem Michigan | 2011 | |
| 119 | battery building electrode slurry instrumentation work | Ilkwang Tech Co. Ltd. | 2011 | |
| 118 | battery building mixer room polarization work | LG Chemical Co. Ltd./Ochang | 2011 | |
| 117 | production & installation of low quality coal solid-liquid separation process and oil absorption process | Korea Institute of Energy Research | 2011 | |
| 116 | Mid to large type electrode raw material room work | LG Chemical Co. Ltd./Ochang | 2011 | |
| 115 | Ochang 2nd plant battery mid to large type SRS 2 building construction technical service | LG Chemical Co. Ltd./Ochang | 2011 | |
| 114 | North American electrode SRP production installation work | LG Chem Michigan | 2011 | |
| 113 | Mid to large type electrode SRP recovery facility production installation/td> | LG Chemical Co. Ltd./Ochang | 2011 | |
| 112 | North American electrode raw material room work | LG Chem Michigan | 2011 | |
| 111 | Ochang 2nd plant SRS raw material room installation work | LG Chemical Co. Ltd./Ochang | 2011 | |
| 110 | LG Chemical Ochang battery mid to large type electrode expansion technical service | LG Chemical Co. Ltd./Ochang | 2011 | |
| 109 | B1 PROJECT production facility work | ENG Technology Co. Ltd. | 2011 | |
| 108 | 1T/D grade coal gasification process design production and installation | Korea Institute of Energy Research | 2011 | |
| 107 | OLED substance plumbing and common device system establishment | LG Chemical Co. Ltd./Ochang | 2011 | |
| 106 | Electrode #7 SRP recovery facility production installation and installation work | LG Chemical Co. Ltd./Ochang | 2011 | |
| 105 | Facility, production, installation and commissioning of medication system for producing synthetic oil using 15 BPD coal | Korea Institute of Energy Research | 2011 | |
| 104 | Mid to large type electrode slurry transportation electric instrumentation work | LG Chemical Co. Ltd./Ochang | 2011 | |
| 103 | Electronic material S-TFT related technical service | LG Chemical Co. Ltd./Ochang | 2011 | |
| 102 | Electrode mixer room production and installation work | LG Chemical Co. Ltd./Ochang | 2011 | |
| 101 | Mid to large type electrode cotter external ventilation duct work | LG Chemical Co. Ltd./Ochang | 2011 | |
| 100 | OLED substance plant construction project technical service | LG Chemical Co. Ltd./Cheongju | 2011 | |
| 99 | Cathode active precursor pilot facility production installation | ENF Technology Co. Ltd. | 2011 | |
| 98 | battery mid to large type electrode technical service | LG Chemical Co. Ltd./Ochang | 2010 | |
| 97 | LED ENCAP plumbing and electric machinery device installation work | LG Chemical Co. Ltd./Cheongju | 2010 | |
| 96 | Mid to large type electrode slurry transportation tank electric instrumentation work | LG Chemical Co. Ltd./Ochang | 2010 | |
| 95 | Mid to large type external ventilation duct work | LG Chemical Co. Ltd./Ochang | 2010 | |
| 94 | Mid to large type SRS raw material room work사 | LG Chemical Co. Ltd./Ochang | 2010 | |
| 93 | Mid to large type raw material room work | LG Chemical Co. Ltd./Ochang | 2010 | |
| 92 | Positive electrode material expansion technical service | LG Chemical Co. Ltd./Cheongju | 2010 | |
| 91 | Positive electrode material process device and plumbing system establishment work | LG Chemical Co. Ltd./Cheongju | 2010 | |
| 90 | Mid to large type electrode raw material room work | LG Chemical Co. Ltd./Ochang | 2010 | |
| 89 | Low grade coal pilot size drying stabilization integrated process production | Korea Institute of Energy Research | 2010 | |
| 88 | Manufacturing & installation of synthetic oil production system using 15 BPD coal | Korea Institute of Energy Research | 2010 | |
| 87 | Electrolysis liquid expansion project technical service | LG Chemical Co. Ltd./Cheongju | 2010 | |
| 86 | Electrolysis liquid process plumbing system establishment work | LG Chemical Co. Ltd./Cheongju | 2010 | |
| 85 | 2010 LG Chemical Ochang battery mid to large type technical service/td> | LG Chemical Co. Ltd./Ochang | 2010 | |
| 84 | Low grade coal drying system pilot design production installation | Korea Institute of Energy Research | 2011 | |
| 83 | project pilot system expansion work | LG Chemical Co. Ltd./Cheongju | 2009 | |
| 82 | Coal processing slurry system production installation | Korea Institute of Energy Research | 2009 | |
| 81 | Mid to large type electrode mixer room work | LG Chemical Co. Ltd./Ochang | 2009 | |
| 80 | Manufacturing installation of gasifier using 1T/D grade coal | Korea Institute of Energy Research | 2009 | |
| 79 | Positive electrode material ancillary facility and plumbing work | LG Chemical Co. Ltd./Cheongju | 2009 | |
| 78 | Positive electrode material expansion and system device and plumbing work | LG Chemical Co. Ltd./Cheongju | 2009 | |
| 77 | Positive electrode material production line facility work | LG Chemical Co. Ltd./Cheongju | 2009 | |
| 76 | Battery electrode project technologies service | LG Chemical Co. Ltd./Ochang | 2009 | |
| 75 | Ink production facility and office building expansion work | Korim Co. Ltd. | 2008 | |
| 74 | Battery building electrode production line facility production installation | LG Chemical Co. Ltd./Ochang | 2008 | |
| 73 | Battery building mixer room plumbing work | LG Chemical Co. Ltd./Ochang | 2008 | |
| 72 | Electrode raw material room work | LG Chemical Co. Ltd./Ochang | 2008 | |
| 71 | Battery building raw material room facility production installation | LG Chemical Co. Ltd./Ochang | 2008 | |
| 70 | SN project PW system and process plumbing work | Samnam Pharmaceutical Co. Ltd. | 2008 | |
| 69 | Toner expansion machinery, electric work | LG Chemical Co. Ltd./Iksan | 2008 | |
| 68 | Project expansion technical service | LG Chemical Co. Ltd./Ochang | 2007 | |
| 67 | Project technical service | Samnam Pharmaceutical | 2007 | |
| 66 | LGLS large scale alpha IA Project work | LG Life Science Co. Ltd/Iksan | 2007 | |
| 65 | Raw material processing facilities reinforcing work | KT&G Co. Ltd | 2007 | |
| 64 | Project technical service | Dongbang FTLCo., Ltd. | 2007 | |
| 63 | Waste heat recovery work | LG Chemical Co. Ltd. Daesan | 2006 | |
| 62 | Oven production installation work | Yusung Chemical Industry Co. Ltd. | 2006 | |
| 61 | BNF project work | Endicorp Co. Ltd. | 2006 | |
| 60 | Process improvement work | LG Chemical Co. Ltd. Daesan | 2006 | |
| 59 | U.S. local plant project | Mark Stone Co. Ltd. | 2006 | |
| 58 | Pilot facility improvement work | LG Chemical Co., Ltd. Technology Institute | 2006 | |
| 57 | Project technical service | LG Chemical Co., Ltd. Cheongju | 2006 | |
| 56 | Process sector turnkey work | LG Chemical Co., Ltd. Cheongju | 2006 | |
| 55 | Raw material room mixer and measurement facility production installation work | LG Chemical Co., Ltd. Ochang | 2006 | |
| 54 | LGCIM maintenance technical service | LGCIM | 2006 | |
| 53 | Monoryum 2nd plant rationalization technical service | LG Chemical Co., Ltd./ Cheongju | 2005 | |
| 52 | PTVS technical service | LG Chemical Co., Ltd./ Ochang | 2005 | |
| 51 | Main Power main line work | LG Chem Industrial Materials,Inc/U.S. | 2005 | |
| 50 | Optical mixing room production installation work | LG Chemical Co., Ltd./ Ochang | 2005 | |
| 49 | Optical raw material room production installation work | LG Chemical Co., Ltd./ Ochang | 2005 | |
| 48 | LGCIM) himax MEP related local work | LG Chem Industrial Materials,Inc/U.S. | 2005 | |
| 47 | Light walking facility rationalization project technical service | LG Chemical Co., Ltd./ Cheongju | 2005 | |
| 46 | VINYL SIDING ancillary facility production, installation | LG Chemical Co., Ltd./ Cheongju | 2005 | |
| 45 | Light walking Em view installation technical service | LG Chemical Co., Ltd./ Cheongju | 2005 | |
| 44 | Video material photosensitive material installation & expansion ENG | LG Chemical Co., Ltd. / Cheongju plant | 2004 | |
| 43 | Battery plant raw material feeding and measurement | LG Chemical Co., Ltd./ Ochang Technopark | 2004 | |
| 42 | Facility production. installation | LG Chemical Co. Ltd. / Ochang Technopark | 2004 | |
| 41 | LGCN optical ancillary facility production purchase | LG International Corp | 2004 | |
| 40 | Taiwan optical ancillary facility production purchase | LG International Corp | 2004 | |
| 39 | China new type building material VIP TILE expansion service | China Tianjin LG New Building Material | 2004 | |
| 38 | U.S. himax project domestic facility turn key work | LGChemIndustrialMaterials,Inc | 2004 | |
| 37 | INS facility relocation work | INS Co. Ltd. | 2004 | |
| 36 | Heat treatment facility, production assembly, commissioning | SSC Co. Ltd. | 2003 | |
| 35 | Raw material feeding and measurement facility production, installation | LG Chemical / Ochang Technopark | 2003 | |
| 34 | New expansion ENG | LG Chemical Co., Ltd. / Cheongju plant | 2003 | |
| 33 | Facility relocation work | INS Co., Ltd. | 2003 | |
| 32 | Raw material room installation work | Heesung Chemical Co. Ltd. | 2002 | |
| 31 | Toner expansion installation work | LG Chemical / Iksan | 2002 | |
| 30 | Oven production installation work | LG Chemical / Cheongju | 2002 | |
| 29 | EPC facilities production and installation work | LG Chemical / Iksan | 2002 | |
| 28 | CAL relocation work | Woojin Corporation | 2002 | |
| 27 | China Tianjin VIP tile work | LG Chemical | 2002 | |
| 26 | Production facility installation work | PNC Co. Ltd. | 2001 | |
| 25 | Machinery relocation and installation work | Mosel Wallpaer Co., Ltd. | 2002 | |
| 24 | Relocation work accompanied by compressor | LG Chemical / Iksan | 2001 | |
| 23 | Expansion PROJECT | Mosel Wallpaer Co., Ltd. | 2001 | |
| 22 | Utility plumbing work | Techwinpia Co. Ltd. | 2001 | |
| 21 | Dust collection and ancillary facility production installation work | Woojin Corporation | 2001 | |
| 20 | Electric facilities installation electric work | Techwinpia Co. Ltd. | 2001 | |
| 19 | Vietnamese production facility production | LG Chemical / Cheongju | 2001 | |
| 18 | Pre-mixer room relocation work | LG Chemical / Iksan | 2001 | |
| 17 | Console for press production and electric work | Samchang Heavy Industry | 2001 | |
| 16 | CUTTING SAW M/C production installation | LG Chemical / Cheongju | 2001 | |
| 15 | Press out line work | LG Chemical / Iksan | 2001 | |
| 14 | Pilot facility production | LG Chemical / Cheongju | 2001 | |
| 13 | production line facility work | Haengsung Chemical Co. Ltd. | 2001 | |
| 12 | Woodworking processor installation work | Daebung Corporation | 2001 | |
| 11 | Research Pilot building facility rearrangement | LG Chemical / Cheongju | 2001 | |
| 10 | Smart wall panel cutter renovation work | LG Chemical / Cheongju | 2001 | |
| 9 | Manufacturing facility relocation electric work | Seoul Aerosol | 2001 | |
| 8 | Firefighting facility electric work | LG Chemical / Iksan | 2001 | |
| 7 | New production of wall panel mold and additional electric work | LG Chemical / Cheongju | 2001 | |
| 6 | Bag Filter duct work | Daea machinery | 2001 | |
| 5 | Boiler pipe cleaning and device purchases | Techwinpia Co. Ltd. | 2001 | |
| 4 | AUTO Feeding System | Haengsung Chemical Co. Ltd. | 2001 | |
| 3 | Expansion H-PJT technical service | LG Chemical / Cheongju | 2001 | |
| 2 | PVC measurement and raw material transportation work | Heesung Chemical Co. Ltd. | 2001 | |
| 1 | Calender relocation work | Woojin Corporation Co. Ltd. | 2001 |