Best Quality and Advanced Technology for our Customers
arrow_downward
检查功能和状态,体系化地调查检讨及文件化
GMP PLANT新建及重修概念的设计
(Conceptual Design Study) 计算投资费
GMP PLANT CONSTRUCTION
包括工序机械及设备的基本及详细设计
(Basic and Detail Design)
资格评估及批准 (DQ / IQ/ GQ/PQ)
编写VMP、CV、PV、CSV执行
GMP培训及文件管理SOPs
生产工序机械的购买及调配业务
(URS, FAT, SAT, Procurement)
MAINTENANCE(维修及维护)
Concept Design
Basic Design
Detail Design
Bulding / Construction
HWAC /Clean Room Ststem
Water System
Piping System (Process, Utility)
Electric, Instrument, Auto-Control
Waste Water System
VMP (Validation Master Plan)
IQ (Installation Qualification)
OQ(Operation Qualification)
PQ(Performance Qualification)
CV(Cleaning Validation
SMF(Site Master File)
PM (Preventive Maintenance)
Hepa Filter Management
Calibration
Drawing Management
Utility Operation